Electrical Panel Upgrade cost breakdown
| Option | Typical installed cost |
|---|---|
| Panel replacement (same amperage) | $1,200 – $2,500 |
| 100A → 200A upgrade | $1,800 – $4,500 |
| 200A → 400A upgrade | $3,500 – $8,000 |
| Subpanel | $600 – $1,800 |
| Meter base replacement | $300 – $1,200 |
| EV charger circuit (Level 2) | $600 – $2,000 |
Estimate your electrical panel upgrade cost
Your estimated range (USD)
- National typical range
- —
- Duration
- 1 day (power off 4–8 hrs)
What drives the price
Utility work
Some utilities charge to upgrade the service drop or transformer.
Panel location
Moving the panel adds wiring and wall repair.
Code corrections
Grounding, bonding and AFCI/GFCI updates are often required at inspection.
Permit fees
Vary widely by city.
Recall-era panels
Federal Pacific and Zinsco panels should be replaced regardless of capacity.
Signs you need electrical panel upgrade
- Breakers tripping frequently
- Flickering lights when appliances start
- Fuses instead of breakers
- Federal Pacific, Zinsco or Challenger brand panel
- Planning an EV charger, heat pump or major remodel
DIY or hire a pro?
Pro only
Panel and service work is lethal if done wrong and requires a permit and utility coordination. Always hire a licensed electrician.
Get up to 3 free electrical panel upgrade quotes
Compare local pros against the ranges above. Free, no obligation.
Watch: How to upgrade an electrical panel to 200-amp service

Video plays from YouTube; rights remain with the creator.
How to save on electrical panel upgrade
- Do a load calculation first — a smart load manager can sometimes avoid a full upgrade.
- Bundle EV charger and panel work in one permit.
- Ask the utility about free service upgrades.
- Schedule early; utility disconnect appointments book out.
Questions to ask before you hire
- Is utility coordination and the permit included?
- Does the quote cover meter base and grounding upgrades?
- What brand panel and how many spaces?
- How long will power be off?
- Will you label every circuit?
Electrical Panel Upgrade FAQ
Do I need 200 amps?
If you plan an EV charger plus electric heat or cooking, usually yes. A load calculation decides.
How long does it take?
Usually one day, with power off for 4–8 hours.
Is a Federal Pacific panel dangerous?
Many electricians and insurers consider them a fire risk due to breakers that may fail to trip.
Resale value: Removes a buyer and insurer red flag. Cost data: typical U.S. installed prices for 2026 compiled by Home.Direct from published contractor cost guides, supplier pricing and industry surveys; reviewed November 2026. Canadian prices often run 20–35% higher in CAD. Get written local quotes before you decide.